Voltronic Power AXPERT-VM-II-SELECTIONGUIDEAXPERTVMII2500-24
The Axpert VM II SelectionGuideAxpertVMII2500-24 is a off-grid solar inverter rated SelectionGuideAxpertVMII2500-24. Every figure on this page is read from the
Download PDF Datasheet WhatsApp UsTechnical Specifications
| Parameter | AXPERT-VM-II-SELECTIONGUIDEAXPERTVMII2500-24 |
|---|---|
| PV String Input Data | |
| Max PV Array Power | 3000W |
| MPPT Voltage Range | 60-400 VDC |
| Max PV Open-Circuit Voltage | 450 VDC |
| Electrical / AC Output Data | |
| Surge / Peak Power | 5000VA |
| Output Waveform | Pure sine wave |
| AC Voltage Regulation (Battery Mode) | 230VAC ± 5% |
| Battery Data | |
| Floating / Constant Charge Voltage | 27 VDC |
| Mechanical Data | |
| Net Weight | 7.1 kg |
| Operating Conditions | |
| Operating Temperature | -10°C to 50°C |
| Storage Temperature Range | -15°C to 60°C |
Note: Specifications are based on the official Voltronic Power AXPERT-VM-II-SELECTIONGUIDEAXPERTVMII2500-24 datasheet. Values may be subject to change; always verify against the latest manufacturer documentation before system design and procurement.
Availability & grid compliance in UAE
| Market | UAE |
| Grid authority / regulator | DEWA, ADDC, SEWA |
| Quotation currency | AED |
| Support hours timezone | Asia/Dubai |
| Delivery & installation coverage | Dubai, Abu Dhabi, Sharjah, Ajman, Ras Al Khaimah |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in UAE that is DEWA, ADDC, SEWA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.
Availability & grid compliance in Egypt
| Market | Egypt |
| Grid authority / regulator | EgyptERA, NREA |
| Quotation currency | EGP |
| Support hours timezone | Africa/Cairo |
| Delivery & installation coverage | Cairo, Alexandria, Giza, Aswan |
Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Egypt that is EgyptERA, NREA. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.