The Axpert MAX TWIN PV11K PV13K PV18K Axpert MAX E TWIN 11K is an off-grid solar inverter rated Axpert MAX E TWIN 11K.

Models Covered: AXPERT-MAX-TWIN-PV11K-PV13K-PV18K-AXPERT-MAX-E-TWIN-11K

Manufacturer: Voltronic Power

Application: The Axpert MAX TWIN PV11K PV13K PV18K Axpert MAX E TWIN 11K is an off-grid solar inverter rated Axpert MAX E TWIN 11K. Every figure on this page is read from the manufacturer's manual for the Axpert MAX TWIN PV11K PV13K PV18K series.

Technical Specifications

Technical Specifications
Parameter AXPERT-MAX-TWIN-PV11K-PV13K-PV18K-AXPERT-MAX-E-TWIN-11K
Electrical / AC Output Data
Parallel Capability YES, 6 units
Selectable Voltage Range 170-280 VAC (For Personal Computers)
AC Voltage Regulation (Battery Mode) 230VAC ± 5%
Max Efficiency 93%
Rated AC Power 11000VA/11000W
Surge / Peak Power 22000VA
Communication
Communication Interface USB/RS232/RS485/WiFi/Dry-contact
PV String Input Data
Max PV Array Power 13000W (6500W x 2)
Additional Specifications
Maxmum Solar Charge Current 150A
Maximum AC Charge Current 150A
Maximum Charge Current 150A
Mechanical Data
Net Weight 18.4
Operating Conditions
Relative Humidity 5% to 95%
Operating Temperature -10°C to 50°C
Storage Temperature Range -15°C to 60°C

Figures are measured at the test conditions the manufacturer’s datasheet states. A dash means the manufacturer publishes no figure for that model.

Availability & grid compliance in Yemen

Market Yemen
Grid authority / regulator Public Electricity Corporation (PEC), Ministry of Electricity and Energy
Quotation currency YER
Support hours timezone Asia/Aden
Delivery & installation coverage Sana'a, Aden, Taiz, Al Hudaydah, Mukalla

Figures on this page are the manufacturer's own, measured at the test conditions the datasheet states — they do not change by country. What changes is the approval that has to be met before the unit is energised: in Yemen that is Public Electricity Corporation (PEC), Ministry of Electricity and Energy. Confirm the grid code, import requirements and any local certification with them, or with us, before you order.